4/6 -10/7/23 Week 12 - Week 15
Chan Siew Ni #0352518
Bachelor of Design in Creative Media
Bachelor of Design in Creative Media
Minor Project // Final Project
INSTRUCTION
<iframe
src="https://drive.google.com/file/d/1p1V4GohA8Yyey2g10wCJbie7-hgdwFzY/preview"
width="640" height="480" allow="autoplay"></iframe>
QUICK LINKS
FINAL PROJECT // FINAL PRESENTATION
Week 12: Refined Prototypes
For this week, after we received the feedback, we then started to make
changes that were requested by Angsana Tenang Team.
Figure 1: work progress on making changes and refinement in Figma
Figure 1.1: work progress on making Animation(Slider) in Figma
Week 13: Preparation For Final Presentation
Figure 1.2: work progress on making presentation slides
Figure 1.3: work progress on making presentation slides
Week 14: Preparation For Final Presentation
For this week, a member of the Angsana Team has commented on something new
for making the changes. So, we work on it and make sure complete before our
presentation.
Figure 1.4: Work progress on adding icons
Figure 1.5: Work progress on changing icons
Week 15: Presentation
Figure 1. 6: Final Presentation
FINAL PRESENTATION SLIDES
<iframe src="https://drive.google.com/file/d/1B2pkks_WpsI-HCxGwQbr2E68wAL1c3v7/preview" width="640" height="480" allow="autoplay"></iframe>
FEEDBACK
Week 12: For this week, we didn't get to ask for feedback as we got no
progression because Angsana Tenang Team has just given us the feedback and
we are working on the refinement part.
Week 13:
Mr Mike said that since we had almost done our prototype, we have time to
think about ways to promote this app. He asked us to prepare for that so
that what can we give to the client is not only the app.
Week 14: Mr Mike said that we are good to go. Just make sure we update our
blog and also tell Angsana team the final presentation date.
Week 15: Overall, the client is satisfied with the results and Mr Khor has
suggested that the revamped and removed features part can list out the date
that they commented and also the date that we make changes so that they can
have a rough timeline.
REFLECTIONS
Week 12:
After receiving the conclusion, we then start to change the things that
they requested. There are some parts that I think are good but some parts
I think that is either the old version better or it is unnecessary for me.
Overall those are all minor changes in different sections.
Week 13:
Mostly our final prototype is done. We left our presentation slides and
also have to prepare some promotional tools for them. I feel that It will
be ending soon.
Week 14:
I felt so relieved as we had finally done everything and now just left the
final presentation. I'm glad that we have done the prototype before the due
date because now I got more time to focus on my other modules.
Week 15:
I am so happy and glad that the client and Mr Mike are satisfied with the
results. And at the same time also surprised that Mr Mike gave us a
compliment. I am so satisfied with the results as I really like overall
everything that has been designed by us. Thanks to the team members who are
paying such efforts and we only can finish everything on time. Thanks to Mr
Mike who always stands by our side and helps us fight for our rights.